NOMAC, Al Dur2 IWPP_banner NOMAC, Al Dur2 IWPP_banner NOMAC, Al Dur2 IWPP_banner

Al Dur2 IWPP

AL DUR PHASE II IWPP

OVERVIEW

Al Dur2 IWPP is an Independent Water and Power Project located at Al Dur in the Kingdom of Bahrain. The Plant shall be developed to generate 1,500 MW of Power based on Combined Cycle Gas Turbine(CCGT) technology and produce 50 MIGD of water through Sea Water Reverse Osmosis (SWRO) technology. The plant shall be integrated with the existing Intake and Outfall facilities while the Gas Connection Facilities shall be developed and transferred to Tatweer to facilitate supply of Natural Gas to the Plant. The Plant is expected to be fully operational by Q2 2022.

Click below for:

KEY FACTS

  • LOCATION

    Al Dur, Bahrain

  • OFFTAKER

    Electricity and Water Authority, Bahrain (EWA)

  • POWER

    1,500 MW

  • DESALINATED WATER

    227 m3/day

  • FUEL

    Natural Gas

  • PROJECT COST

    USD 1,100 Mn

  • ACWA POWER SHARE

    60%

  • OFFTAKE CONTRACT

    PPA-BOO 20 years

  • OTHER INVESTORS

    Mitsui (30%), Almoayyed Contracting Group WLL (10%)

  • EPC

    Consortium of SEPCO III, Power China & Sidem

  • O&M

    NOMAC

  • NOMAC, Population icon

    2,000 +

    employees across the globe

  • NOMAC, Meter icon

    28,000 + MW

    of power generation

  • NOMAC, Water Meter icon

    5.3 + million m3/day

    of desalinated water production

  • NOMAC, Countries flag icon

    10 + countries

    of global presence

NOMAC, Our Operations, NOMAC Globally, Al Dur2 IWPP-Brochure-Icon

NOMAC Corporate Brochure

We are proud to bring you home your most important needs of everyday... Water & Electricity by providing safe and reliable O&M Solutions.

Click to Download
loader

Loading